Home › Interior & Flooring › Installation time

How long does flooring installation take in Dubai?

Updated 22 October 2026

Stairs clad in light oak SPC in a Dubai villa, BestFloor project

Timeline at a glance

Stage1-bed apartmentVilla ~200 m²
WhatsApp, photos, price rangeFirst stepFirst step
Site visit, final quoteBefore bookingBefore booking
NOC (if required)Depends on buildingDepends on community
Preparation and layingDay 1Days 1 and 2
StairsUsually noneLast day
Total installationAbout 1 dayAbout 2 to 3 days

Source: BestFloor's installation process guide.

What happens on the day

  1. Protection of doorways, walls and units
  2. Tile preparation: low spots, deep grout, loose tiles
  3. Door trimming
  4. Planks clicked and floated
  5. Expansion gaps at walls and doorways
  6. Skirting and transition profiles
  7. Clean-up

Approval time

Wasl, for example, states up to 5 working days from payment for residential NOCs. Other buildings differ. See our approval guide.

How to keep the schedule

Real example

The Aura Gardens villa: 220 m² including full stair cladding in 2 to 3 days.

Frequently asked questions

How long does SPC flooring take in an apartment?

About 1 day for a 1-bedroom, once the subfloor is ready.

How long for a villa?

About 2 to 3 days for around 200 m², including stairs and skirting.

Can I walk on it straight away?

Yes. Nothing is glued, so finished rooms can be used right away.

Do I need to move out?

Not usually; rooms are done in stages and furniture moves into finished rooms.

Is it noisy or dusty?

Much less than tile removal: no demolition, mainly plank cutting.

What delays installation most?

Missing approvals, rooms not cleared, and other trades not finished.

How long does an NOC take?

It depends on the building. Wasl states up to 5 working days for residential requests.

What happens to doors?

Doors that would rub on the higher floor are trimmed on the day.

Related guides: Renovation approval · Flooring over tiles · SPC price per m² · Renovation without demolition

Research date: 22 October 2026. Service details, prices and timelines are quoted from bestfloor.ae as published on 22 October 2026; prices are indicative and the final quote follows a site visit. Third-party figures are attributed to their source. No reviews or projects are invented on this page; photos are from BestFloor projects as published on its website. This is general information, not legal advice.