The five checks

CheckHow to testIf it fails
1. Flatness2 m straight edge; max 2 to 3 mm variation over 2 mLevel low spots first
2. Loose or hollow tilesTap with a screwdriver handleFix single tiles; large hollow areas mean removal
3. Grout linesLook for deep or wide jointsFill before laying
4. MoistureDark grout, musty smell, swollen skirtingFix the leak first
5. Door and fitting clearanceMeasure gap under doors, wardrobe tracks, dishwasherTrim doors, add profiles

Source: BestFloor's SPC over tiles guide. The floor rises by roughly the plank thickness, 5 mm or 6.5 mm.

Real example: Aura Gardens, Tilal Al Ghaf

From BestFloor's case study: a 3-storey, 4-bedroom twin villa with 5 bathrooms. 220 m² of SPC through living areas, bedrooms, kitchen and maid's room, with full stair cladding and white skirting following the stairs. Laid directly over the existing tiles; bathrooms stayed tiled. Install time 2 to 3 days. Budget about AED 18,000 to 25,000 including 5% VAT.

Over tiles vs removing tiles

SPC over tilesRemove tiles first
Noise and dustLowHigh, demolition
DebrisOffcuts and packagingBroken tiles, adhesive
Floor heightRises by plank thicknessCan stay level
ApprovalsUsually still neededUsually needed

Villa specifics

Frequently asked questions

Can I put SPC flooring over tiles in my villa?

Yes, if the tiles are sound, level within about 2 to 3 mm over 2 m, and dry. Loose or hollow areas need fixing first.

How much height does it add?

Roughly the plank thickness: 5 mm or 6.5 mm in BestFloor's range. Doors and fittings are measured before installation.

Will my doors still close?

Doors that would rub are trimmed on installation day. Transition profiles finish edges at bathrooms and balconies.

What about hollow tiles?

Single loose tiles are fixed. If large areas sound hollow, the tiles should come out first.

Are stairs included?

Stairs can be clad in matching SPC. BestFloor prices stairs individually after a site visit.

How long does a villa take?

About 2 to 3 days for around 200 m², once the subfloor is ready. The 220 m² Aura Gardens villa took 2 to 3 days.

Do I still need an NOC?

Usually yes or at least community approval. Even a floating floor is often treated as renovation work.

Should bathrooms be covered too?

No. In the Aura Gardens villa bathrooms stayed tiled, and BestFloor does not install SPC in showers or wet rooms with floor drains.

Related guides: SPC price per m² · Installation time · Renovation approval · Renovation without demolition

Research date: 22 October 2026. Service details, prices and timelines are quoted from bestfloor.ae as published on 22 October 2026; prices are indicative and the final quote follows a site visit. Third-party figures are attributed to their source. No reviews or projects are invented on this page; photos are from BestFloor projects as published on its website. This is general information, not legal advice.